Volume 15, Number 2 (Iranian Journal of Physics Research,summer( proceedings ) 2015)                   IJPR 2015, 15(2): 215-223 | Back to browse issues page



DOI: 10.18869/acadpub.ijpr.15.2.215

XML Persian Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

ghasemi F, abasidavani F, lamehirachti M, ahmadiannamini S. Investigation of e-Linac tube construction method and implementation suitable method for IPM e-Linac. IJPR. 2015; 15 (2) :215-223
URL: http://ijpr.iut.ac.ir/article-1-1843-en.html

, FAbbasi@sbu.ac.ir
Abstract:   (2511 Views)

The goal of electron linear accelerator project in institute for research in fundamental sciences(IPM) is to build its components as many as they can in Iran. This accelerator is a traveling wave type. Investigations show that there are various techniques in forming and connecting the accelerating tube cavities. The shrinking method applied for constructing the accelerating tube is selected based on the one applied for Stanford University’s Mark III accelerator. With success in building an 8-cavity test tube and finding the problems of the method, the construction of the final accelerating tube with 24 cavities has been accomplished. The results show that the obtained frequency of 2996.5 MHz and quality factor of 11200, satisfy the design desired values.

Full-Text [PDF 1088 kb]   (668 Downloads)    
Type of Study: Research | Subject: general

Add your comments about this article : Your username or email:
Write the security code in the box

Send email to the article author


© 2015 All Rights Reserved | Iranian Journal of Physics Research

Designed & Developed by : Yektaweb